SeamlessDocs

Hood Suppression
Underground Piping
Fire Suppression
04/18/2026Click to Sign
checkbox_psE
checkbox_6Go
checkbox_x1a
Signature HereClick to Sign
04/18/2026Click to Sign
Completed
Include payment for permit fees
CheckBox_0
Name of owner and occupant
CheckBox_1
Point of compass
CheckBox_2
CheckBox_3
CheckBox_4
Location and size of concealed spaces closets attics and bathrooms
NO
CheckBox_5
Make
Total area protected by each system on each floor
CheckBox_6
CheckBox_7
CheckBox_8
Location and size of riser nipples
CheckBox_0
CheckBox_1
All control valves check valves drain pipes and test connections
Make type model and size of alarm dry pipe pre action or deluge valve
Kind and location of alarmbells
CheckBox_2
CheckBox_3
CheckBox_4
NO
For hydraulically designed systems the information on the hydraulic datanameplate
A graphic representation of the scale used on all plans
The minimum rate of water application density
The total quantity of water and the pressure required at a common reference point for each system
CheckBox_5
Information about antifreeze solution used type and amount
Size and location of hydrants showing size and number of outlets and if outlets are to be equipped with
Size location and piping arrangement of fire department connections
CheckBox_6
CheckBox_7
CheckBox_0
Flowlocation
CheckBox_1
Residual pressure psi bar
Flow gpm L min
Date
CheckBox_2
Test conducted by or information suppliedby
CheckBox_3
Hydraulic calculations shall be prepared on form sheets that include a summary sheet detailed
Date
Location
Name of owner and occupant
CheckBox_0
Description of hazard
Name and address of contractor designer
CheckBox_1
System design requirements
Design area of water application ft
CheckBox_2
Area per sprinkler
Total water requirements as calculated including allowance for inside hose outside hydrants and water
Allowance for in rack sprinklers gpm L min
Limitations dimension flow and pressure on extended coverage or other listed special sprinklers
Detailed worksheets or computer printout sheets shall contain the following information
CheckBox_3
CheckBox_4
Hydraulic reference points
CheckBox_5
CheckBox_6
Pipe lengths center to center of fittings
CheckBox_7
CheckBox_8
Total friction loss between reference points
CheckBox_9
Elevation head in psi bar between referencepoints
Required pressure in psi bar at each reference point
NO
NO_1
CheckBox_10
CheckBox_0
A graphic representation of the complete hydraulic calculation shall be plotted on semiexponential
Water supply curve
CheckBox_1
CheckBox_2
CheckBox_3
Signature HereClick to Sign
04/18/2026Click to Sign
x

Additional Signatures Required